  1. Ward 1 with 16- 20 beds floor area (1027 sq ft------)

  2. Operating Theatre 1 with A/C (254.9 sq ft------)

  3. Operating Theatre 2 with A/C (0261. sq ft-----)

  4. Sterilizing room (064. sq ft-----)

  5. Patients Toilets and Wash rooms(296.44 sq ft-----)

  6. Patients Examination room

  7. Office / Record Room (94.5 sq ft.-----)

  8. Doctors Room with Toilet (174.00 sq ft.-----)

  9. Nurses Room with Washroom (213.35 sq ft-----)

  10. Verandahs and Lobbies (1310.78 sq ft-----)

  11. Ground Water Tank and Overhead Tank with Motor.

  12. Surface and Rain Water Drain system

  13. Three Phase Electricity connection Installed

  14. Security wall around Hospital

  15. Security personnel (2) Employed 24 hours of the day.

  16. Beds (32) obtained from Australia through a Lions Club

  17. Fans and Lights Fitted.

  18. Air Conditioners to OT Fixed

  19. Water supply with sump and Motor and Purification plant Installed.

  20. Generator Gifted

  21. Sterility Plan to hospital to be recommended