Phase 1
The details of the completed sections of Phase 1 is shown below.
Ward 1 with 16- 20 beds floor area (1027 sq ft------)
Operating Theatre 1 with A/C (254.9 sq ft------)
Operating Theatre 2 with A/C (0261. sq ft-----)
Sterilizing room (064. sq ft-----)
Patients Toilets and Wash rooms(296.44 sq ft-----)
Patients Examination room
Office / Record Room (94.5 sq ft.-----)
Doctors Room with Toilet (174.00 sq ft.-----)
Nurses Room with Washroom (213.35 sq ft-----)
Verandahs and Lobbies (1310.78 sq ft-----)
Ground Water Tank and Overhead Tank with Motor.
Surface and Rain Water Drain system
Three Phase Electricity connection Installed
Security wall around Hospital
Security personnel (2) Employed 24 hours of the day.
Beds (32) obtained from Australia through a Lions Club
Fans and Lights Fitted.
Air Conditioners to OT Fixed
Water supply with sump and Motor and Purification plant Installed.
Generator Gifted
Sterility Plan to hospital to be recommended